Only one job to be done tonight, and that is to install the inner sheer rails. I couldn't also install the stringers because the rubber bands that are clamping the inner sheer rails need to use the stringer notches. The sheer rails are composed of two laminated strips on both sides of the hull where the hull meets the deck. The frames have notches for both the inner and outer sheer rails. The idea is that you epoxy on the inner sheer rail to the notches on the frames one day and let it cure. Then the next day you run epoxy down the entire length of the inner sheer rail and then laminate on the outer sheer rail. It's the lamination of the two rails that adds so much strength to the hull. The lamination also permanently holds the two rails together in the proper curve. Later on during planking, you will actually add, essentially, a third sheer rail when you laminate on the first plank. In this first picture, you can see the inner sheer rails on Frame 0. They are held toge...